Development

Let directly to questions, because we must today finish making them, clarifying that anyway they left us out dozens and dozens of them on issues of paramount importance to the construction of the city that we want to how the draft of the Master Plan of public transport whose goals are the implement a comprehensive mobility Plan subject to approval by the City Council and implement the corridors by 50%?, bus stops, transport systems, unification of rates and companies; According to the result of studies, all within the program a Covenant by the transport and mobility? You have profiled and repriming at least 100 Km (the goal is 200 Km) of roads that are in affirmed, which was promised in the program maintenance and recovery of the mesh road? Recovered at least 100,000 square meters of patching the road mesh that is in poor condition and at least 8 Kms of roads in poor condition have resurfaced (goals for the Governor were 200,000 M2 and 16 kilometers, therefore not be)? (preveia hasta ese momento la aprobacion de las fenomenales vigencias futuras por 30.000 millones de pesos), which was promised in the same program maintenance and recovery of the mesh road? At least 5 kilometers has been built (the goal of the Governor is to leave at least 10 MTS Kms) of the new bypass, which was promised in the same program maintenance and recovery of the mesh road? What is the project of completion of works unfinished that includes, among others, the termination of the Via Highway Surabastos, the continuation of the race 2 and 3 between streets 64 and 92 of the city of Neiva, splicing with Carrera 7, the completion of the intersection, located at the North exit of the city of Neiva, at the site where it joins race 7W with output to Bogota D.C?do, completion of the 18th Street between 52 and 55 races, right lane and Carrera 55 between streets 18A and 19 in the city of Neiva, the completion of the 7 race between streets 3 and 26 South and the purchase of farms of 6th Street between 7 and 8 career? What there was of the North Road of via Neiva-Caguan which was promised to build 1.3 Km? What was the continuation of the race 16 from the 7 Avenue (Alberto Galindo) until the street 64, which includes road intersection with 7 career? Do and the construction of career 6W, from 48th Street to the 64, splicing the 6w to the race race 1 and construction of the second carriageway of race 1 between the calle 48 to 56? And the construction of the bridge of 28 career and their respective accesses that communicates the commune 6 with 8 commune? Do many square meters in particular have been built in 10 communes, taking into account that were promised at least 50,000 M2? Do many of the 15,000 M2 of roads in particular, offered to the populated rural have been built until today? Maintenance has become even 160 kms (the goal is 320 KMs) of tertiary roads? Do many of the 30,000 square meters in public space that was promised to recover policivamente recovered effectively? How will the construction of treatment plants for wastewater of Matamundo, bridge Santander and the deer? And the construction and improvement of the propanoductos and/or rural pipelines for 2 population centres? How many 30 silicone aqueducts and 600 promised sanitary batteries have been built until today? Already promised you acquired the machine of fire for forest fires or a fast displacement? As you can see, are many, but many questions that surely the Administration will not end of answer in the already scarce 17 months it detracts from his constitutional period. . .